Public Notices

Notice of Quorum

Please be advised that on November 24, 2026, at 1:00 p.m., a quorum of the Board of Directors ("the Board") of the East Valley Water District ("the District") may participate in a tour of certain wastewater facilities located within the District's jurisdiction that has been organized by the District’s staff.

Pursuant to Government Code Section 54952.2(c)(3), this assemblage of the Board is not a meeting subject to the requirements of the Ralph M. Brown Act, Government Code Sections 54950 through 54963. The Board will not discuss any business of a specific nature within the subject matter jurisdiction of the District, except as part of the scheduled tour.

If you have any questions or comments, please feel free to contact the General Manager/CEO at (909) 885-4900 during the District's regular business hours.

Dated: November 17, 2026

Notice of Intent to Adopt a Mitigated Negative Declaration: Well 152 Project

NOTICE IS HEREBY GIVEN that the East Valley Water District is intending to adopt a Mitigated Negative Declaration. 

Project Description: EVWD proposes the drilling, construction, operation, and maintenance of a new potable groundwater supply well to replace production lost due to
decommissioning existing wells. The site would include the following features: a new wellhead; an approximately 900-square-foot split-face Concrete Masonry Unit well building with a maximum height of 18 feet; an approximately 200-square-foot chemical building containing separate rooms for chlorine and orthophosphate storage tanks; a 58,000-gallon above-ground water storage tank measuring approximately 25 feet in diameter and 18 feet tall; an approximately 400-square-foot booster station equipped with two 125-horsepower electric pumps; an approximately 350-kilowatt pad-mounted standby diesel generator; and new connections to existing storm drain system and potable water pipelines. The District anticipates that the new well would be drilled to a depth of approximately 800 feet below ground surface with a maximum 42-inchdiameter casing. The well would be equipped with an electric motor and designed to produce approximately 2,000 gallons per minute of potable groundwater.

Pursuant to CEQA Guidelines Section 15087(c)(6), no hazardous material waste
sites are located within the Project area as reviewed by this Initial Study
Mitigated Negative Declaration.

A copy of the Initial Study and all other material which constitutes the record of proceedings upon which the District based its decision to adopt this Mitigated Negative Declaration may be obtained at the District’s website (www.eastvalleywater.gov) or it can be obtained electronically at the District’s physical address at:

East Valley Water District
31111 Greenspot Road, Highland, CA 92346
Contact Person: Jason Marseilles
Phone: (909) 806-4088
Email: [email protected]

The CEQA-required public review period of the Initial Study/Mitigated Negative Declaration begins Tuesday, November 10, 2026 and ends on Wednesday, December 9, 2026 (30-days). Written comments on the Initial Study should be submitted to Mr. Jason Marseilles at the mailing address listed above no later than Wednesday, December 9, 2026 by 5:00 PM.

For more information, you may contact the East Valley Water District at the above address or by telephone at (909) 885-4900 during regular business hours.